Availability
This schedule is available in all territories served by the Cooperative, subject to the Cooperative’s established Service Rules and Regulations.
Applicability
This schedule is applicable to any consumer of the Cooperative for the yard, security, or decorative lighting from dusk to dawn.
Monthly Rate
Yard or Security Lights
100-Watt High-Pressure Sodium | $12.00 |
100-Watt High-Pressure Sodium – Decorative | $18.40 |
400-Watt Metal Halide – Flood | $18.55 |
1000-Watt Metal Halide – Flood | $ 24.10 |
175-Watt Metal Halide – Cobra | $ 34.40 |
175-Watt Metal Halide Decorative Acorn | $ 34.20 |
175-Watt Metal Halide Decorative Acorn w/ 2 Lights | $ 43.65 |
175-Watt Metal Halide Decorative Shoebox w/ 2 Lights | $ 40.95 |
250-Watt Metal Halide Decorative Acorn | $ 35.40 |
250-Watt Metal Halide Decorative Acorn w/ 2 Lights | $ 45.15 |
400-Watt Metal Halide – Cobra | $ 35.60 |
43-Watt LED | $ 10.10 |
50-Watt LED | $ 10.10 |
129-Watt LED | $ 18.55 |
200-Watt LED | $ 20.15 |
Additional Charges:
For wooden poles required for yard lighting in addition to existing distribution poles, a charge of $2.15 per month per extra pole shall apply.
Decorative Lighting
Carrying Charge: | 2% of the Total Installation Cost |
Energy Charge: | 5.55 cents per kWh (based on the type of light installed) |
Condition of Service
Lighting equipment including lamps, fixtures, controls, and conductors will be furnished and maintained by the Cooperative.
Lamp replacement will be made by the Cooperative with an additional charge, except that any damage to lamps and luminary resulting from vandalism shall be charged to the consumer as a separate item on the monthly bill. The bill shall be based on the Cooperative’s actual cost.
Consumers should report outages promptly. Lamps will be serviced only during regular working hours of the Cooperative.
Wholesale Power Cost Adjustment
The Cooperative’s approved Wholesale Power Cost Adjustment shall be applicable to all service supplied under this Schedule.
Sales Tax
Any applicable State and local sales taxes will be added to all services billed under this Schedule.
Availability
This schedule is available in all territories served by the Cooperative, subject to the Cooperative’s established Service Rules and Regulations.
Applicability
This schedule is applicable for residential use and for use incidental thereto supplied through one meter to each individual residence or apartment unit. The residence is defined as a metered dwelling suitable to be a single-family unit with kitchen and bathroom facilities and the primary place in which a member resides.
Type of Service
Service under this schedule shall be single-phase, 60 cycles, at one of the Cooperative’s available secondary voltages.
Monthly Rate
Basic Facilities Charge: | $ 29.50 | |
Energy Charge: | All kWh | 13.27 ¢ per kWh |
Minimum Charge
The minimum monthly charge shall be the Basic Facilities Charge shown above.
Wholesale Power Cost Adjustment
The Cooperative’s approved Wholesale Power Cost Adjustment shall be applicable to all services supplied under this Schedule.
Sales Tax
Any applicable State and local sales taxes will be added to all services billed under this Schedule.
Availability
This schedule is available in all territories served by the Cooperative, subject to the Cooperative’s established Service Rules and Regulations.
Applicability
This schedule is applicable for residential use and for use incidental thereto supplied through one meter to each individual residence or apartment unit. A residence is defined as a metered dwelling suitable to be a single-family unit with kitchen and bathroom facilities and the primary place in which a member resides.
Type of Service
Service under this schedule shall be single-phase, 60 cycles, at one of the Cooperative’s available secondary voltages.
Monthly Rate
Basic Facilities Charge: | $ 29.50 |
Energy Charges: | |
On-Peak Energy | 48.00 ¢ per On-Peak kWh |
Off-Peak Energy | 8.00 ¢ per Off-Peak kWh |
Minimum Charge
The minimum monthly charge shall be the Basic Facilities Charge shown above.
On-Peak and Off-Peak Periods
October 16 – April 15
On-Peak Hours: | 6:00 AM to 9:00 AM, Monday – Friday |
Off-Peak Hours: | All other hours |
April 16 – October 15
On-Peak Hours: | 2:00 PM to 6:00 PM, Monday – Friday |
Off-Peak Hours: | All other hours |
All hours of the following holidays shall be considered off-peak:
New Year’s Day, Good Friday, Fourth of July, Labor Day, Thanksgiving Day, Day after Thanksgiving Day, Christmas Eve, and Christmas Day.
Wholesale Power Cost Adjustment
The Cooperative’s approved Wholesale Power Cost Adjustment shall be applicable to all services supplied under this Schedule.
Sales Tax
Any applicable state and local sales taxes will be added to all services billed under this Schedule.
Availability
This schedule is available in all territories served by the Cooperative, subject to the Cooperative’s established Service Rules and Regulations.
Applicability
Applicable to non-residential single-phase and three-phase consumers whose monthly demand never exceeds 1,000 kW.
Type of Service
Service under this schedule shall be single-phase or three-phase, 60 cycles, at one of the following voltages: 120/240, 120/208, or 240/480. Motors in excess of one (1) horsepower shall be connected to operate on not less than 208 volts. Motors having a rated capacity in excess of 10 horsepower must be three-phase. However, single-phase motors in excess of 10 horsepower may be served under this Schedule provided the consumer installs a phase converter for the operation of the same. Motors having a rated capacity of 20 or more horsepower must have reduced voltage starters.
Monthly Rate
Basic Facilities Charges:
Single-Phase | $ 45.00 |
Three-Phase | $ 100.00 |
Where the monthly billed demand is less than 100 kW the demand and energy charge shall be calculated using the charges and blocks directly below.
Demand Charges:
First 15 kW | $ 0.00 per kW |
All kW over 15 | $ 9.50 per kW |
Energy Charges:
First 2,500 kWh | 12.88 ¢ per kWh |
Next 7,500 kWh | 9.18 ¢ per kWh |
Next 40,000 kWh | 7.76 ¢ per kWh |
All kWh over 50,000 | 6.60 ¢ per kWh |
Where the monthly billed demand is 100 kW or greater the charges shall be the lower of the demand and energy charges shown above or the energy charge shown below.
Energy Charge:
All kWh | 16.97 ¢ per kWh |
Minimum Monthly Charge
The minimum monthly charge shall be the highest of the following charges as determined for the consumer in question:
- The appropriate Basic Facilities Charge as stated above, or
- The minimum monthly charge specified in the consumer’s contract for power.
Determination of Billing Demand
The billing demand shall be the highest of the following:
- The maximum kilowatt demand established for a period of 15 consecutive minutes during the month, as may be adjusted for power factor as provided below,
- Fifty (50) percent of the contract demand, or
- The minimum billing demand is stated in the consumer’s power contract.
Power Factor Adjustment
The consumer agrees to maintain a unity power factor as nearly as practicable. Demand charges will be adjusted for consumers with 50 kW or more of measured demand to correct for an average power factor lower than 90 percent, and may be so adjusted for other consumers if the Cooperative deems it necessary. Such adjustments will be made by increasing the measured demand by 1 percent for each 1 percent that the average power factor is less than 90 percent lagging.
Condition of Service
Prior to the procurement of electric motors and actual service connection thereto, the consumer shall consult with the Cooperative to verify service characteristics and agree on service conditions. The consumer shall install or have installed protective devices on all electric motors and equipment to protect same in case the supply of electricity shall fail or be interrupted, or become defective through the act of God, or the public enemy, or state, municipal, or public authority, or any other cause beyond the reasonable control of the Cooperative. The Cooperative shall not be liable for such failure, interruption, or defect.
Wholesale Power Cost Adjustment
The Cooperative’s approved Wholesale Power Cost Adjustment shall be applicable to all services supplied under this Schedule.
Sales Tax
Any applicable State and local sales taxes will be added to all services billed under this Schedule.
Availability
This schedule is available on a voluntary and limited basis, at the Cooperative’s option. This rate shall be limited to the availability of appropriate meters and will be limited further by the saturation and/or impact on the Cooperative’s electric system of consumers utilizing this Rate Schedule in a general area.
Applicability
Applicable to those three-phase and single-phase consumers whose monthly demand has exceeded 25 KW at least once during the most recent twelve months.
Type of Service
Service under this schedule shall be single-phase or three-phase, 60 cycles, at one of the following voltages: 120/240, 120/208, or 240/480. Motors having a rated capacity in excess of 10 horsepower must be three-phase. However, single-phase motors in excess of 10 horsepower may be served under this Schedule provided the consumer installs a phase converter for the operation of the same. Motors having a rated capacity of 20 or more horsepower must have reduced voltage starters.
Monthly Rate
Basic Facilities Charges:
Single-Phase | $ 70.95 |
Three-Phase | $ 135.90 |
Demand Charges:
On-Peak Demand | $ 17.50 per kW of On-Peak Demand |
Maximum Monthly Demand | $ 4.95 per kW of Off-Peak Demand |
Energy Charges:
On-Peak Energy | 7.50 ¢ per On-Peak kWh |
Off-Peak Energy | 5.00 ¢ per Off-Peak kWh |
Minimum Charge
The minimum monthly charge shall be the appropriate Basic Facilities Charge shown above.
Condition of Service
Prior to the procurement of electric motors and actual service connection thereto, the consumer shall consult with the Cooperative to verify service characteristics and agree on service conditions. The consumer shall install or have installed protective devices on all electric motors and equipment to protect same in case the supply of electricity shall fail or be interrupted, or become defective through the act of God, or the public enemy, or state, municipal, or public authority, or any other cause beyond the reasonable control of the Cooperative. The Cooperative shall not be liable for such failure, interruption, or defect.
Determination of Billing Demand
The On-Peak Billing Demand shall be the maximum kilowatt demand established by the consumer during a 15-minute interval, during on-peak hours, within the month for which the bill is rendered, as indicated or recorded by a demand meter and adjusted for power factor. The Maximum Monthly Billing Demand shall be the maximum kilowatt demand established by the consumer during a 15-minute interval, during all hours, within the month for which the bill is rendered, as indicated or recorded by a demand meter and adjusted for power factor.
Power Factor Adjustment
The consumer agrees to maintain a unity power factor as nearly as practicable. Demand charges will be adjusted for consumers with 50 kW or more of measured demand to correct for an average power factor lower than 90 percent, and may be so adjusted for other consumers if the Cooperative deems it necessary. Such adjustments will be made by increasing the measured demand by 1 percent for each 1 percent so that the average power factor is less than 90 percent lagging.
On-Peak and Off-Peak Periods
October 16 – April 15
On-Peak Hours: | 6:00 AM to 9:00 AM, Monday – Friday |
Off-Peak Hours: | All other hours |
April 16 – October 15
On-Peak Hours: | 2:00 PM to 6:00 PM, Monday – Friday |
Off-Peak Hours: | All other hours |
All hours of the following holidays shall be considered off-peak:
New Year’s Day, Good Friday, Fourth of July, Labor Day, Thanksgiving Day, Day after Thanksgiving Day, Christmas Eve, and Christmas Day.
Wholesale Power Cost Adjustment
The Cooperative’s approved Wholesale Power Cost Adjustment shall be applicable to all services supplied under this Schedule.
Sales Tax
Any applicable State and local sales taxes will be added to all services billed under this Schedule.
Availability
This schedule is available in all territories served by the Cooperative, subject to the Cooperative’s established Service Rules and Regulations.
Applicability
This schedule is applicable to those three-phase consumers whose monthly demand has exceeded 1,000 kW at least once during the most recent twelve months.
Type of Service
Service under this schedule shall be three-phase, 60 cycles, at the following voltages: 120/208 or 240/480. Motors having a rated capacity in excess of 40 horsepower must have reduced voltage starters.
Monthly Rate
Basic Facilities Charge: | $ 1,000.00 |
Where the monthly billed demand is less than 100 kW the demand and energy charge shall be calculated using the charges and blocks directly below.
Demand Charge:
All kW | $ 11.25 per kW |
Energy Charges:
First 219 kWh per kW | 5.72 ¢ per kWh |
Next 219 kWh per kW | 5.10 ¢ per kWh |
All kWhs over 438 kWh per kW | 4.47 ¢ per kWh |
Where the monthly billed demand is 100 kW or greater the charges shall be the lower of the demand and energy charges shown above or the energy charge shown below.
Energy Charge:
All kWh | 25.24 ¢ per kWh |
Minimum Monthly Charge
The minimum monthly charge shall be the highest of the following charges as determined for the consumer in question:
- The appropriate Basic Facilities Charge as stated above, or
- The minimum monthly charge specified in the consumer’s contract for power.
Determination of Billing Demand
The billing demand shall be the highest of the following:
- The maximum kilowatt demand established for a period of 15 consecutive minutes during the month may be adjusted for power factor as provided below,
- Fifty (50) percent of the contract demand,
- The minimum billing demand that may be provided in the consumer’s power contract, or
- Seventy-five (75) percent of the highest billing demand was established during the preceding 11 months.
Power Factor Adjustment
The consumer agrees to maintain a unity power factor as nearly as practicable. Demand charges will be adjusted for consumers with 50 kW or more of measured demand to correct for an average power factor lower than 90 percent, and may be so adjusted for other consumers if the Cooperative deems it necessary. Such adjustments will be made by increasing the measured demand by 1 percent for each 1 percent so that the average power factor is less than 90 percent lagging.
Service at Primary Voltage
If service is furnished at primary distribution voltage, a discount of six (6) percent shall apply to the monthly bill. However, services may be metered at the secondary voltage and adjusted to primary metering by adding the estimated transformer losses to the metered kilowatt-hour and kilowatt demand.
Condition of Service
Prior to the procurement of electric motors and actual service connection thereto, the consumer shall consult with the Cooperative to verify service characteristics and agree on service conditions. The consumer shall install or have installed protective devices on all electric motors and equipment to protect same in case the supply of electricity shall fail or be interrupted, or become defective through the act of God, or the public enemy, or state, municipal, or public authority, or any other cause beyond the reasonable control of the Cooperative. The Cooperative shall not be liable for such failure, interruption, or defect.
Wholesale Power Cost Adjustment
The Cooperative’s approved Wholesale Power Cost Adjustment shall be applicable to all services supplied under this Schedule.
Sales Tax
Any applicable State and local sales taxes will be added to all services billed under this Schedule.
Availability
This schedule is available on a voluntary and limited basis, at the Cooperative’s option. This rate shall be limited to the availability of appropriate meters and will be limited further by the saturation and/or impact on the Cooperative’s electric system of consumers utilizing this Rate Schedule in a general area.
Applicability
Service under this schedule is applicable to three-phase consumers whose monthly kW demand has exceeded 1,000 kW at least once during the most recent twelve months.
Type of Service
Service under this schedule shall be three-phase, 60 cycles, at the following voltages: 120/208 or 277/480. Motors having a rated capacity of more than 40 horsepower must have reduced voltage starters
Monthly Rate
Basic Facilities Charges: | $ 1,100.00 per Month |
Demand Charges:
On-Peak Demand | $ 16.20 per kW of On-Peak Demand |
Maximum Monthly Demand | $ 5.20 per kW of Off-Peak Demand |
Energy Charges:
On-Peak Energy | 6.80 ¢ per On-Peak kWh |
Off-Peak Energy | 4.49 ¢ per Off-Peak kWh |
Minimum Charge
The minimum monthly charge shall be the highest of the following charges as determined for the consumer in question:
- The appropriate Basic Facilities Charge as stated above,
- $1.75 times the kVA rating of the transformer installed to meet the consumer’s load requirements, or
- The minimum monthly charge specified in the consumer’s contract for power.
Condition of Service
Prior to the procurement of electric motors and actual service connection thereto, the consumer shall consult with the Cooperative to verify service characteristics and agree on service conditions. The consumer shall install or have installed protective devices on all electric motors and equipment to protect same in case the supply of electricity shall fail or be interrupted, or become defective through the act of God, or the public enemy, or state, municipal, or public authority, or any other cause beyond the reasonable control of the Cooperative. The Cooperative shall not be liable for such failure, interruption, or defect.
Determination of Billing Demand
The On-Peak Billing Demand shall be the maximum kilowatt demand established by the consumer during a 15-minute interval, during on-peak hours, within the month for which the bill is rendered, as indicated or recorded by a demand meter and adjusted for power factor. The Maximum Monthly Billing Demand shall be the maximum demand established by the consumer during a 15-minute interval, during all hours, within the month for which the bill is rendered, as indicated or recorded by a demand meter and adjusted for power factor.
On-Peak and Off-Peak Periods
October 16 – April 15
On-Peak Hours: | 6:00 AM to 9:00 AM, Monday – Friday |
Off-Peak Hours: | All other hours |
April 16 – October 15
On-Peak Hours: | 2:00 PM to 6:00 PM, Monday – Friday |
Off-Peak Hours: | All other hours |
All hours of the following holidays shall be considered off-peak:
New Year’s Day, Good Friday, Fourth of July, Labor Day, Thanksgiving Day, Day after Thanksgiving Day, Christmas Eve, and Christmas Day.
Power Factor Adjustment
The consumer agrees to maintain a unity power factor as nearly as practicable. Demand charges will be adjusted for consumers with 50 kW or more of measured demand to correct for an average power factor lower than 90 percent, and may be so adjusted for other consumers if the Cooperative deems it necessary. Such adjustments will be made by increasing the measured demand by 1 percent for each 1 percent so that the average power factor is less than 90 percent lagging.
Service at Primary Voltage
If service is furnished at primary distribution voltage, a discount of six (6) percent shall apply to the monthly bill. However, services may be metered at the secondary voltage and adjusted to primary metering by adding the estimated transformer losses to the metered kilowatt-hour and kilowatt demand.
Wholesale Power Cost Adjustment
The Cooperative’s approved Wholesale Power Cost Adjustment shall be applicable to all services supplied under this Schedule.
Sales Tax
Any applicable State and local sales taxes will be added to all services billed under this Schedule.
Applicability
This rider is applicable to and becomes a part of all the Cooperative’s Rate Schedules and Riders, which provide for the supply of metered electric service.
Billing
The Cooperative reserves the right to implement a Wholesale Power Cost Adjustment charge at such time as the average cost of purchase power to the Cooperative deviates by 0.001 cents per kWh from the base cost of purchased power used in the design of the Cooperative’s retail Rate Schedules. The Wholesale Power Cost Adjustment (WPCA) will be applicable to all kWh billed under the Cooperative’s retail Rate Schedules and will be calculated as follows:
WPCA = C – B x P + D
S
Where:
C = Actual purchased power costs for the most recent 6 months available plus the projected purchased power costs for the six months immediately thereafter.
B = Base cost of purchased power (6.993¢ / kWh) built into the retail rates.
P = Actual kWh purchases for the most recent 6 months available plus the projected kWh purchases for the six months immediately thereafter.
D = The total accumulated difference between the Cooperative’s WPCA charges and the purchased power posts applicable to this clause through the end of the most recent month available.
S = Actual kWh sold for the most recent 6 months available plus the projected kWh sold for the six months immediately thereafter.
Applicability
Service under this Rider is applicable to all retail consumers of the Cooperative for the recovery of the Cooperative’s incremental costs associated with meeting their Renewable Energy Portfolio Standard (REPS) pursuant to North Carolina General Statute 62-133.8 and NCUC Rule R8-67.
This Rider is not for resale service. The provisions of the Schedule with which this Rider is used are modified only as shown herein. Service rendered under this Rider is subject to the provisions of the Cooperative’s Service Rules and Regulations on file with the state regulatory commission.
Monthly Rate
In addition to all other charges stated in the Monthly Rate of the Schedule with which this Rider is used, the following charges shall also apply:
Revenue Class | REPS Rate | REPS EMF | Total Monthly Rate |
Residential | $ 0.63 | ($ 0.42) | $0.21 |
Commercial | $ 3.51 | ($ 2.33) | $1.18 |
Industrial | $23.38 | ($15.50) | $7.88 |
Definitions
- Renewable Energy Portfolio Standard (REPS) Rate – The REPS Rate shall be adjusted annually to reflect the incremental and development costs the Cooperative anticipates incurring for the upcoming year to comply with the North Carolina Renewable Energy and Energy Efficiency Portfolio Standard divided by the weighted number of consumers projected in each revenue class over the same twelve-month
- Renewable Energy Portfolio Standard Experience Modification Factor (REPS EMF) – The REPS EMF is a rate calculated annually to recover the difference between reasonably and prudently incurred REPS costs and REPS revenues realized during the period under
Applicable Taxes
The total charges under the Rider will be increased by applicable sales taxes imposed by any governmental authority.
Availability
Service under this Rider is available only to consumers located in the Cooperative’s service territory who have qualifying facilities fueled by trash or methane derived from landfills, hog waste, poultry waste, or other renewable (wind, photovoltaic, biomass-fueled, hydro) generating facilities contracting to sell generating capacity and energy greater than 25 kW but not in excess of 500 kW, which are interconnected directly with the Cooperative’s system and which are qualifying facilities as defined by the Federal Energy Regulatory Commission pursuant to Section 210 of the Public Utility Regulatory Policies Act of 1978.
Service necessary for the delivery of the consumer’s power into the Cooperative’s system under this Rider shall be furnished solely to the individual contracting consumer in a single enterprise, located entirely on a single, contiguous premise. Service hereunder shall be restricted to the capacity of the consumer’s generating facilities which may be operated in parallel with the Cooperative’s system. Service necessary to supply the consumer’s total load requirements other than Auxiliary Load, and service necessary to supply the consumer’s Auxiliary Load when the consumer’s generating facilities are not operating, shall be billed on the applicable Schedule(s) of the Cooperative. Power delivered to the Cooperative under this Rider shall not offset or be substituted for power contracted for or which may be contracted for under any other Schedule of the Cooperative. Prior to receiving service under this Rider, the consumer must have a signed “Standard Interconnection Agreement” between the consumer and the Cooperative.
The obligations of the Cooperative in regard to service under this Rider are dependent upon its securing and retaining all necessary rights-of-way, privileges, franchises, and permits for such service. The Cooperative shall not be liable to any consumer or applicant for power in the event it is delayed in or is prevented from purchasing power by its failure to secure and retain such rights-of-way, rights, privileges, franchises, and permits. Consumers receiving service under this Rate Rider must have their renewable generation registered with the North Carolina Utilities Commission prior to connecting to the Cooperative’s system.
Character of Service
Service shall be provided at one point of delivery through a single meter at one of the following voltages. Standard service shall be single-phase, 120/240 Volts, and 60 Hz. Three-phase service may be provided where available. Where three-phase service is available, voltages may be:
208/120 Volts or 480/277 Volts, 4-Wire wye
Service at other voltages may be available, at the option of the Cooperative.
Monthly Rate
The following charges and credits will be added to the consumer’s monthly bill based on the nameplate rating of the renewable generating facility:
Supplemental Monthly Basic Facilities Charges:
Over 25 kW to 100 kW | $ 7.50 per month |
Over 100 kW to 500 kW | $ 15.00 per month |
Interconnection Facilities Charge 1: | $ 5.00 per month |
1 The Interconnection Facilities Charge may be increased according to the provisions of the paragraph entitled “Interconnection Facilities Charge” below.
Energy Credits: | Variable Rate | 5 Years Fixed |
All Energy per Month: | 2.82 ¢ per kWh | 2.96 ¢ per kWh |
Renewable Energy Certificates
Payments and/or credits for the Renewable Energy Certificates (RECs) and any environmental attributes produced as a result of the energy generated by the renewable generation shall be negotiated between the consumer and the Cooperative on a case-by-case basis, with the Cooperative having the first right of refusal. The negotiated price shall be based on the type of generation and the market for similar certificates at the time the generation comes online. Consumers receiving compensation for the RECs from the Cooperative shall not be eligible to participate in NC GreenPower’s renewable generation program.
Interconnection Facilities Charge
The consumer shall be responsible for providing suitable control and protective devices on their equipment to assure no disturbance to other consumers of the Cooperative or to the Cooperative itself, and to protect the consumer’s facilities from all loss or damage which could result from operation with the Cooperative’s system. All interconnection equipment, including control and protective devices, must meet or exceed the National Electric Code (NEC), National Electric Safety Code (NESC), and Institute of Electrical and Electronics Engineers (IEEE) Standards.
The Cooperative will furnish, install, own, and maintain and the consumer shall make an upfront contribution in aid of construction equal to the installed cost of all distribution, service, and interconnection-related facilities necessary for service under this Rider. Interconnection facilities include suitable control and protective devices installed on Cooperative equipment to allow operation of the consumer’s generating facilities; metering facilities equipped to prevent reverse registration for the measurement of service under this Rider; and any other modifications to its system required to serve the consumer under this Rider as determined by the Cooperative. All such distribution, service, and interconnection-related facilities shall be subject to a monthly Interconnection Facilities Charge equal to 1.0% times the installed cost of the required interconnection-related facilities.
The Cooperative reserves the right to install facilities necessary for the appropriate measurement of service under this Rider and to adjust the Interconnection Facilities Charge accordingly, solely at the option of the Cooperative.
Power Factor Correction
When the average monthly power factor of the power supplied by the consumer to the Cooperative is less than 97 percent or greater than 100 percent, the Cooperative may correct the energy, in kilowatt-hours, as appropriate. The Cooperative reserves the right to install facilities necessary for the measurement of power factor and to adjust the Interconnection Facilities Charge accordingly, solely at the option of the Cooperative.
Rate Updates
The Energy Credits and Supplemental Monthly Basic Facilities Charge of this Rider may be updated on an annual basis. Any changes in the Energy Credits will be based upon changes in the avoided cost of the Cooperative’s wholesale power supplier. Members who have contracted for the Fixed Long Term Credits will not be affected by updates in the Energy Credits until their rate term expires. For all Qualifying Facilities selling to the Cooperative pursuant to the Variable Credit provisions of this Rider, such credits shall be updated and changed in accordance with changes in the avoided cost of the Cooperative’s wholesale power supplier.
Definitions
Nameplate Capacity: The term “Nameplate Capacity” shall mean the maximum continuous electrical output capability of the generation at any time at a power factor of ninety-seven percent (97%).
Capacity: The term “Capacity” shall mean the Nameplate Capacity of the consumer’s generating facilities, less the portion of that capacity needed to serve the generating facilities’ Auxiliary Load.
Auxiliary Load: The term “Auxiliary Load” shall mean power used to operate auxiliary equipment in the facility necessary for power generation (such as pumps, blowers, fuel preparation machinery, and exciters).
Month: The term “Month” as used in this Rider means the period intervening between meter readings for the purposes of monthly billing, such readings being taken once per month.
Payments
Credit billings to the consumer shall be payable to the consumer within twenty-five (25) days of the date of the scheduled meter reading.
Contract Period
Each consumer shall enter into a contract that will specify the capacity of the Qualifying Facility and shall specify the initial term and the associated rate at the time the contract is executed. The initial term for consumers receiving credits under the variable rate and the five-year fixed long-term rate shall be a minimum of five (5) years.
The Cooperative reserves the right to terminate the consumer’s contract under this Rider at any time upon written notice to the consumer in the event that the consumer violates any of the terms or conditions of this Rider or operates it's generating facilities in a manner that is detrimental to the Cooperative or any of its consumers or fails to deliver energy to the Cooperative for six (6) consecutive months. In the event of early termination of a contract under this Rider, the consumer will be required to pay the Cooperative for costs due to such early termination.
Sales Tax
Any applicable State and local sales taxes will be added to all services billed under this Rider.
Availability
Service under this Rider is available only to consumers located in the Cooperative’s service territory who own a small renewable generator (wind, photovoltaic, biomass-fueled, hydro) that is interconnected directly with and operated in parallel with the Cooperative’s distribution system with a capacity of 25 kW or less and contract with the Cooperative to sell all generating capacity and energy to the Cooperative.
Service necessary for the delivery of the consumer’s power into the Cooperative’s system under this Rider shall be furnished solely to the individual contracting consumer in a single enterprise, located entirely on a single, contiguous premise, and owned by the consumer installing the small renewable generator. Service hereunder shall be restricted to the capacity of the consumer’s generating facilities. Power delivered to the Cooperative under this Rider shall not offset or be substituted for power contracted for under any other schedule of the Cooperative.
The obligations of the Cooperative in regard to service under this Rider are dependent upon its securing and retaining all necessary rights-of-way, privileges, franchises, and permits for such service. The Cooperative shall not be liable to any consumer or applicant for power in the event it is delayed in or is prevented from purchasing power by its failure to secure and retain such rights-of-way, rights, privileges, franchises, and permits.
Type of Service
Service under this schedule shall be single-phase, 60 cycles, at one of the Cooperative’s available secondary voltages.
Rate
The following charges and credits will be added to the consumer’s monthly bill:
Supplemental Monthly Basic Facilities Charge: | $3.75 |
Credit for energy delivered to Cooperative: | 2.82 ¢ per kWh |
The monthly minimum bill for consumers receiving this service shall be no less than the Basic Facilities Charge in the rate schedule with which this rate is used, plus the supplemental Basic Facilities Charge as stated in this schedule, less any credits for energy delivered to the Cooperative’s system.
Metering Requirements
The Cooperative will furnish, install, own, and maintain metering to measure energy (kilowatt hours) delivered by the Cooperative to the consumer. The Cooperative will also furnish, install, own, and maintain additional metering equipment to measure the kilowatt hours delivered from the consumer to the Cooperative. The consumer’s service will be metered with
two meters equipped to prevent reverse registration, one that will measure any energy delivered by the Cooperative to the consumer, and the other which will measure any energy produced by the consumer’s renewable energy generation system and delivered to the Cooperative. The consumer will bear the cost of providing the necessary meter sockets to enable the Cooperative to make the interconnections. If the home’s electric meter does not provide a means to disconnect power, the homeowner must provide a separate disconnect switch accessible to utility personnel. The Cooperative shall reserve the right to install special metering and load research devices on the consumer’s equipment and the right to use the consumer’s telephone line for communications with the Cooperative and the consumer’s equipment.
Interconnection Requirements
The consumer must submit an application to interconnect the small generation system, which must be approved by the Cooperative. Upon approval of the application, and prior to interconnection to the Cooperative’s electrical system the consumer must sign an interconnection agreement certifying:
- All renewable energy systems equipped with a voltage inverter shall be manufactured, installed, and operated in compliance with Underwriters Laboratory (UL) standard 1741 for distributed generation and have been identified and listed as “utility-interactive”.
(Note: Induction type generators shall be approved on a case-by-case basis.) - That the system/installation complies with the National Electric Code (NEC) and all applicable codes and that the system has been inspected and approved by the electrical inspector having legal jurisdiction.
- The system shall be installed, operated, and maintained in accordance with the manufacturer’s, government, and industry standards and specifications.
- The system shall be installed, operated, and maintained in accordance with the Cooperative’s Bylaws Service Rules and Regulations, and the Small Generation Interconnection agreement at all times.
Contract Term
The contract period for service under this Rider shall be one (1) year and thereafter shall be automatically renewed for successive one-year periods, subject to the availability and terms of the rule of the Small Generation Interconnection Agreement. Service may be terminated by the consumer-owner or the Cooperative in accordance with the terms as stated in the interconnection agreement. The Cooperative reserves the right to inspect the consumer’s small generation system at any reasonable time and to immediately disconnect the consumer’s system without providing prior notice should it be necessary to address a hazardous condition or for failure to comply with any of the specifications and requirements as stated in the Small Generation Interconnection Agreement (PDF).
Availability
This Rider is available in conjunction with any of the Cooperative’s Residential Service schedules where a consumer-owned small renewable generator (wind, photovoltaic, biomass-fueled, hydro) is designed to offset a portion or all of the consumer’s electrical requirements normally supplied by the Cooperative, has been installed on the consumer-side of the meter, is interconnected with and operated in parallel with the Cooperative’s electric distribution system, and the consumer’s intent is to purchase all power requirements from the Cooperative net of any power generated by the consumer’s renewable energy system in any given hour. Any power produced in excess of the consumer’s electrical requirements shall be delivered to the Cooperative.
Service on this Rider shall only be available to consumers who own the property where electrical service is received from and delivered to the Cooperative. The nameplate rating of the small renewable generator must be the lesser of (1) the consumer’s estimated maximum 15-minute integrated demand, (2) the consumer’s Contract Demand, or (3) 25 kW. Small renewable generators connected in parallel with the Cooperative’s facilities must have safety, system protection, and power quality equipment installed and operated in accordance with the rules of the Cooperative. Consumers receiving service under this Rider agree to assign the Renewable Energy Certificates (RECs) and all environmental attributes associated with the small renewable generator to the Cooperative
Service under this Rider shall be available in all territory served by the Cooperative only under written contract and shall be subject to the Cooperative’s established Service Rules and Regulations as filed with the North Carolina Utilities Commission. The provisions of the Schedule with which this Rider is used are modified only as shown herein.
Type of Service
Service under this schedule shall be single-phase at a voltage of 120/240 or three-phase at a voltage of either 120/208 or 240/480, 60 cycles. The type of service supplied will depend upon the voltage available. Prospective consumers should ascertain the available voltage by inquiring at the nearest Cooperative office before purchasing equipment. Three-phase voltage, other than the foregoing, is subject to mutual agreement between the Cooperative and the consumer. Other types of installations may be permitted, subject to approval by the Cooperative.
Rate
The following charges and credits will be added to the consumer’s monthly bill:
Supplemental Monthly Basic Facilities Charge: | $15.15 |
Credit for energy delivered to the Cooperative: | 2.82 ¢per kWh |
The monthly minimum bill for consumers receiving this service shall be no less than the Basic Facilities Charge in the rate schedule with which this rate is used, plus the supplemental Basic Facilities Charge as stated in this schedule, less any credits for energy delivered to the Cooperative’s system.
Metering Requirements
The Cooperative will furnish, install, own, and maintain metering to measure energy (kilowatt-hours) delivered by the Cooperative to the consumer and the energy delivered from the consumer to the Cooperative. When a consumer requests that the Cooperative supply electric service in a manner that requires equipment and facilities beyond those that the cooperative would normally provide, and the Cooperative finds it practical to do so, such excess equipment and facilities will be provided as additional facilities at a cost to the consumer. Costs will be collected through additional facilities charges and/or contributions in aid-to-construction as agreed upon by the Cooperative and the consumer-owner. Due to the complexity and cost of some metering installations, the consumer should contact the Cooperative regarding different metering options prior to the purchase of equipment.
Interconnection Requirements:
The consumer must submit an application to interconnect the small generation system which must be approved by the Cooperative. Upon approval of the application, and prior to interconnection to the Cooperative’s electrical system, the consumer must sign an interconnection agreement certifying:
- All renewable energy systems equipped with a voltage inverter shall be manufactured, installed, and operated in compliance with Underwriters Laboratory (UL) standard 1741 for distributed generation and have been identified and listed as “utility-interactive”.
(Note: Induction type generators shall be approved on a case-by-case basis.)
- That the system installation complies with the National Electric Code (NEC) and all applicable codes and that the system has been inspected and approved by the electrical inspector having legal
- The system shall be installed, operated, and maintained in accordance with the manufacturer’s, government, and industry standards and
- The system shall be installed, operated, and maintained in accordance with the Cooperative’s Bylaws and Service Rules and Regulations, and the Small Generation Interconnection Agreement at all
Contract Term
The contract period for service under this Rider shall be one (1) year and thereafter shall be automatically renewed or successive one-year periods, subject to the availability and terms of the rate of the Small Generation Interconnection Agreement. Service may be terminated by the consumer-owner or the Cooperative in accordance with the terms as stated in the interconnection agreement. The Cooperative reserves the right to inspect the consumer’s small generation system at any reasonable time and to immediately disconnect the consumer’s system without providing prior notice should it be necessary to address a hazardous condition or for failure to comply with any of the specifications and requirements as stated in the Small Generation Interconnection Agreement.
Availability
This Rider is available in conjunction with any of the Cooperative’s Commercial Service schedules where a consumer-owned small renewable generator (wind, photovoltaic, biomass-fueled, hydro) is designed to offset a portion or all of the consumer’s electrical requirements normally supplied by the Cooperative, has been installed on the consumer-side of the meter, is interconnected with and operated in parallel with the Cooperative’s electric distribution system, and the consumer’s intent is to purchase all power requirements from the Cooperative net of any power generated by the consumer’s renewable energy system in any given hour. Any power produced in excess of the consumer’s electrical requirements shall be delivered to the Cooperative.
Service on this Rider shall only be available to consumers who own the property where electrical service is received from and delivered to the Cooperative. The nameplate rating of the small renewable generator must be the lesser of (1) the consumer’s estimated maximum 15-minute integrated demand, (2) the consumer’s Contract Demand, or (3) 500 kW. Small renewable generators connected in parallel with the Cooperative’s facilities must have safety, system protection, and power quality equipment installed and operated in accordance with the rules of the Cooperative. Consumers receiving service under this Rider agree to assign the Renewable Energy Certificates (RECs) and all environmental attributes associated with the small renewable generator to the Cooperative
Service under this Rider shall be available in all territory served by the Cooperative only under written contract and shall be subject to the Cooperative’s established Service Rules and Regulations as filed with the North Carolina Utilities Commission. The provisions of the Schedule with which this Rider is used are modified only as shown herein.
Type of Service
Service under this schedule shall be single-phase at a voltage of 120/240 or three-phase at a voltage of either 120/208 or 240/480, 60 cycles. The type of service supplied will depend upon the voltage available. Prospective consumers should ascertain the available voltage by inquiring at the nearest Cooperative office before purchasing equipment. Three-phase voltage, other than the foregoing, is subject to mutual agreement between the Cooperative and the consumer. Other types of installations may be permitted, subject to approval by the Cooperative.
Rate
The following charges and credits will be added to the consumer’s monthly bill:
Supplemental Monthly Basic Facilities Charge: | $37.60 |
Credit for energy delivered to the Cooperative: | 2.82 ¢per kWh |
The monthly minimum bill for consumers receiving this service shall be no less than the Basic Facilities Charge in the rate schedule with which this rate is used, plus the supplemental Basic Facilities Charge as stated in this schedule, less any credits for energy delivered to the Cooperative’s system.
Metering Requirements
The Cooperative will furnish, install, own, and maintain metering to measure energy (kilowatt-hours) delivered by the Cooperative to the consumer and the energy delivered from the consumer to the Cooperative. When a consumer requests that the Cooperative supply electric service in a manner that requires equipment and facilities beyond those that the cooperative would normally provide, and the Cooperative finds it practical to do so, such excess equipment and facilities will be provided as additional facilities at a cost to the consumer. Costs will be collected through additional facilities charges and/or contributions in aid-to-construction as agreed upon by the Cooperative and the consumer-owner. Due to the complexity and cost of some metering installations, the consumer should contact the Cooperative regarding different metering options prior to the purchase of equipment.
Interconnection Requirements:
The consumer must submit an application to interconnect the small generation system which must be approved by the Cooperative. Upon approval of the application, and prior to interconnection to the Cooperative’s electrical system, the consumer must sign an interconnection agreement certifying:
- All renewable energy systems equipped with a voltage inverter shall be manufactured, installed, and operated in compliance with Underwriters Laboratory (UL) standard 1741 for distributed generation and have been identified and listed as “utility-interactive”.
(Note: Induction type generators shall be approved on a case-by-case basis.)
- That the system installation complies with the National Electric Code (NEC) and all applicable codes and that the system has been inspected and approved by the electrical inspector having legal
- The system shall be installed, operated, and maintained in accordance with the manufacturer’s, government, and industry standards and
- The system shall be installed, operated, and maintained in accordance with the Cooperative’s Bylaws Service Rules and Regulations, and the Small Generation Interconnection Agreement at all times.
Contract Term
The contract period for service under this Rider shall be one (1) year and thereafter shall be automatically renewed or successive one-year periods, subject to the availability and terms of the rate of the Small Generation Interconnection Agreement. Service may be terminated by the consumer-owner or the Cooperative in accordance with the terms as stated in the interconnection agreement. The Cooperative reserves the right to inspect the consumer’s small generation system at any reasonable time and to immediately disconnect the consumer’s system without providing prior notice should it be necessary to address a hazardous condition or for failure to comply with any of the specifications and requirements as stated in the Small Generation Interconnection Agreement.
Availability
Service under this Rider shall be available in all territory served by the Cooperative and shall be subject to the Cooperative’s established Service Rules and Regulations as filed with the North Carolina Utilities Commission. This Rider is a voluntary tariff available to Consumers for the purpose of improving resource efficiency and reducing their net utility bill. This Rider is available to all consumers taking service under Rate Schedules C (Residential), F and F ─ TOD (Commercial), and H, H ─ TOD, and I (Large Commercial/Large Power).
EECLP Investment and Repayment Terms
- No up-front investment is required by participating Consumers. The initial cost of approved energy efficiency measures will be paid by the Cooperative.
- The EECLP repayment obligation shall be assigned to the premises and will survive changes in ownership and/or tenancy.
- EECLP program costs shall be recovered through a monthly EECLP Charge on the utility bill.
- The EECLP Charge shall be treated the same as the Cooperative’s charges for electric service. Failure to make payment may result in disconnection in accordance with the Cooperative’s approved Service Rules and Regulations.
- The EECLP Charge shall be less than or equal to seventy-five (75) percent of the estimated average savings associated with the investment.
- The Cooperative will be responsible for estimating resource savings and developing a Conservation Plan upon which the EECLP Charge will be based.
- If the energy efficiency measure is determined to be faulty, the Cooperative will assess the failure, suspend the EECLP Charge to the degree that savings are compromised, initiate and verify repairs, assign costs to the responsible party, and reinstitute the EECLP charge. If the measure cannot be remedied, the Consumer is released from any obligation to pay.
Conservation Plan
The Conservation Plan will be developed by the Cooperative and specify measures recommended by the Cooperative to the prospective EECLP Consumer. The Conservation Plan includes:
- Estimated Resource Savings ─ The modeled change(s) in costs of resources consumed at the premise attributable to the efficiency measure(s) recommended. The Cooperative will be solely responsible for savings estimates and will utilize generally accepted modeling software and techniques.
- EECLP Charge ─ The charge to be included on Consumer’s utility bill will be based on the cost of the proposed measure(s) and the resulting savings. The Cooperative will be solely responsible for calculating the EECLP Charge utilizing its standard economic model of discounted cash flows. To the extent available, the Cooperative will incorporate rebates into the calculation of the EECLP Charge.
- In calculating the EECLP Charge, the Cooperative may add up to five (5%) percent of the cost of proposed projects as bid by qualified contractors to offset EECLP program costs. The annual interest rate used to calculate the EECLP Charge shall be no more than one and one-half percent (1 ½ %) above the cost of the capital used by the Cooperative to finance the project.
- EECLP Audit Fee – Building owners (Consumers or Landlords) will be charged a $175.00 Audit Fee for completed Conservation Plans. The charge may be waived for Consumers or Landlords who decline to participate.
- Number of Payments ─ The number of periods for which the EECLP Charge will apply at the premises. Unless otherwise specified herein, the EECLP charge shall not exceed the estimated life of the measure or ten (10) years, whichever is less.
- In the event that multiple measures are being completed as part of a Conservation Plan, the EECLP Charge will not appear on the Consumer’s bill until all measures have been completed.
A Consumer’s and Landlord’s (if applicable) signature on the EECLP Agreement shall indicate acceptance of the Conservation Plan.
Uneconomic Measures
A Consumer or Landlord may elect to “buy down” the cost of implementing an efficiency measure so that the EECLP Charge will be less than the average estimated monthly savings. In this way, measures that might not otherwise yield sufficient economic savings to pay for themselves may still be approved. Prior to the Cooperative’s approval of a Conservation Plan that includes one or more uneconomic measures, the Consumer Landlord or a third party must agree to pay the amount required to buy down said measure(s) such that the EECLP Charge is no greater than seventy-five (75) percent of the estimated savings.
New Structures
A Consumer or Owner may utilize this Rider to install high-efficiency equipment or measures in new structures. The Cooperative will only invest at a maximum the difference in cost between the lowest allowable or “standard” efficiency equipment or measure required in the structure and the higher efficiency equipment or measure chosen by the Contractor, Consumer, or Owner. Under any circumstances, the EECLP Charge to appear on the participant’s bill must be less than the average estimated cost of resources saved by the purchase of the higher efficiency equipment or measures.
Responsibilities
Responsibilities, understandings, and authorizations of Consumers, Cooperative, Landlord (if applicable), and Participating Contractor shall be evidenced by written agreements, notifications, and disclosures/consents, the forms of which are made a part of this Rider.
Transition in Roles
Unless otherwise specifically set forth in a standard EECLP agreement made part of this Rider, responsibility for outstanding EECLP obligations falls on the successor party when the roles of Consumer, Landlord, or Tenant change, provided the required disclosure is made and consent to assume the obligation is obtained. For example: If a tenant purchases an apartment complex, that individual assumes the obligations of the Landlord if the disclosure is made and consent is obtained.
Other
- This Rider only applies to EECLP measures permanently installed as fixtures at the premises. Portable efficiency products such as compact fluorescent lights do not qualify under this Rider. The Cooperative will solely determine the permanence of measures or products.
- Premises in which the EECLP measures will be installed must be permanently anchored to a foundation.
- At its sole discretion, the Cooperative may determine the maximum program investment in any year.
- The Cooperative will determine the eligibility of a Consumer based on the Consumer’s bill payment history with the Cooperative, projected energy savings, and program capacity. At its sole discretion, the Cooperative may determine a property is not eligible for the program and does not qualify for this Rider if:
- The structure has an expected life shorter than the payback period, or
- The structure does not meet applicable public safety or health codes.
Availability
Available on a voluntary basis as a program to all territories served by the Cooperative, subject to the Cooperative’s established Service Rules and Regulations of the Cooperative as filed with the North Carolina Utilities Commission. This Rider is available to Consumers of the Cooperative already taking monthly service concurrently under Schedule C (Residential Service) and shall continue through December 31, 2022.
Applicability
This Schedule is applicable for residential use and for use incidental thereto supplied through a meter directly interconnected to Electric Vehicle Supply Equipment installed by the Cooperative at an individual residence. Service under this schedule is limited to no more than fifteen (15) Consumers of or lessees of a “Plug-In Electric Vehicle,” as such term is defined in Section 62- 3(21a) of the North Carolina General Statutes, who execute an Electric Vehicle Charging Program Service Agreement with Cooperative. To qualify for service under this rider, the portion of the Consumer’s load subject to control must be sub-metered off the master meter by Electric Vehicle Supply Equipment as defined in the Electric Vehicle Charging Program Service Agreement.
Type of Service
Service under this schedule shall be at one of the Cooperative’s available secondary voltages.
Monthly Rate
Each customer shall specify in its Electric Vehicle Charging Program Service Agreement one of the following service levels based on the anticipated Electric Vehicle monthly mileage:
Monthly Charge | kWh/Month | Recommended For | Miles Per Day |
$31 | Up to 275* | Battery EV | ~ 25 |
$39 | Up to 350* | Battery EV | ~ 35 |
$50 | Up to 450* | Battery EV | ~ 50 |
All electric energy purchased under this Schedule in excess of the limits for the then-effective service level shall be subject to the rates specified in Schedule C (Residential Service).
Sales Tax
Any applicable State and local sales taxes will be added to all services billed under this Schedule.
Condition of Service
Service supplied under this Schedule shall be subject to the terms of an Electric Vehicle Charging Program Service Agreement with Cooperative and shall terminate upon the termination of any such agreement.
Basic Facilities Charges | $29.50 | |
Membership Fee | $5.00 | |
Meter Fee | $10.00 | |
Security Deposit | Minimum Deposit | $150.00 |
Intermediate Deposit | $300.00 | |
Maximum Deposit | $450.00 |
(Residential Only)
Connection Charge | During regular business hours only | $25.00 |
Late Payment Charge | $6.00 | |
Arrangement Fee | $10.00 | |
Reconnection Charge | During regular business hours only | $50.00 |
After-hours reconnection charge | $80.00 |
(The deadline for payment of delinquent accounts to effect reconnection that same day is 4:00 PM at the EMC office or to EMC field personnel)
After hours service | $80.00 |
Return Check Charge | $25.00 |
Meter Test Charge | $15.00 |
Special Meter Reading Trip | N/C |
Meter Tampering Fee | $300.00 |
Anyone, who engages in vandalism, destruction of Cooperative property, meter tampering, current diversion, or power theft will not have service reconnected until after payment of the old bill or estimated unmetered current PLUS payment for all necessary repairs and fees including a $300.00 Service Charge.
The above outlines the Cooperative’s attempt to settle its claims out of court. However, any member or other person declining to make the required payment will be subject to prosecution under the appropriate General Statue/s of North Carolina. In all instances, the Cooperative reserves the right to pursue its claims through the applicable legal processes
Purpose: To ensure a balance between fairness to Roanoke Electric Membership Corporation’s (the “Cooperative”) existing Member-Owners and those desiring a line extension to facilitate the Cooperative’s provision of electric service.
Policy:
This Policy establishes the basic conditions and requirements associated with adding facilities to existing Cooperative primary or secondary distribution lines to supply electricity to new or modified service installations. The feasibility of any line extension will be considered to ensure safe, reliable service to Applicants for electric service and Member-Owners. Line extension charges may be required to provide reasonable assurance of adequate revenues to amortize the Cooperative’s investment operations and maintenance costs. However, due to the engineering complexity associated with an integrated electric system and with the dynamic nature of the electric industry, this Policy cannot cover in detail all the line extension issues the Cooperative may encounter. Accordingly, the Cooperative shall determine, at its sole discretion and on a case-by-case basis, whether the specific requirements, allowances, advances, and costs outlined in this Policy are applicable.
- Definitions
- Applicant – An applicant for Line Extension services covered by this Policy, whether a Member-Owner or prospective Member-Owner.
- Contribution in Aid of Construction – A non-refundable cash payment covering the costs of an extension or other work that is in excess of Cooperative-funded allowances. Unless otherwise specifically agreed in writing by the Cooperative, any Contribution in Aid of Construction must be paid in full prior to the commencement of design, construction, or other work to which the Contribution in Aid of Construction applies.
- Line Extension – The extension of or the addition of an existing Cooperative distribution power line for the purpose of the provision of electric service.
- Point of Delivery –Except as may be otherwise provided by written agreement between the Cooperative and the Applicant, the point of delivery for overhead service shall be at the point the Applicant’s service entrance conductors are connected to the Cooperative’s service drop conductors or the low voltage terminals of the transformer.
- Plat or Survey –Throughout this policy, the reference to a plat or survey means one printed copy of a properly surveyed and recorded plat/drawing of the subdivision/park plus an electronic copy of that same drawing in an electronic format acceptable to the Cooperative.
- Subdivision –For the purposes of this policy a subdivision is defined as a collection of lots or parcels to be developed that does not have power immediately available to each lot, and primary power lines will need to be constructed to serve new Member-Owners who will occupy them. Where lots or parcels are to be developed along roads that currently have existing primary power lines, the requirements for subdivisions will not apply.
- Dwelling –An enduring, permanent-type dwelling or home which is located on property owned or mortgaged by the Applicant and has potable water under pressure into the dwelling with permanent type plumbing, an appropriate permanent sanitary waste system, and is accessible by an all-weather road.
- General Provisions
- Applicant Weatherhead –The Weatherhead (also called the service head or service entrance cap) must be installed at a point acceptable to the Cooperative and located so the service drop wires will not interfere with fire escapes, windows, shutters, doors, or other parts of the building and will not be readily accessible to persons at windows, doors, etc.
- Point of Attachment –The Point of Attachment of a service drop to a building must, unless otherwise permitted by the Cooperative in writing, be between 15 and 25 feet above the ground. The Point of Attachment shall be at a height to permit the service drop to be installed with a minimum clearance of 18 feet over public roads, streets, or alleys or 15 feet over private driveways, and 10 feet over space accessible to pedestrians only. A clearance of two feet shall be maintained from communication wires. The normal Point of Attachment for overhead service to residential customers must be on the outside wall of the end of the building nearest to the source of the Cooperative’s facilities entering the Applicant’s premises. For underground electric service to a residential Applicant, the normal Point of Attachment must be on the outside wall of the end of the building or the nearest convenient point on the outside of the front or back wall adjacent to the end of the building nearest the source of the Cooperative’s facilities entering the Applicant’s premises. The normal Point of Attachment for all other customers shall be at a location designated by the Cooperative.
- Location of Meter Base –The meter base (when required) shall be installed by the Applicant or the Applicant’s electrical contractor. The meter base shall be installed at a location acceptable to the Cooperative and shall allow the Cooperative reasonable access to the meter at all times. Where there will be multiple meter bases such as an apartment building, condominium, communications tower, etc. gang meter bases shall be utilized to the extent possible. The horizontal centerline of the meter base shall be located at a height not less than 4 feet, and not more than 6 feet.
- Support for Conductors –The Applicant shall provide and maintain safe support for the Cooperative’s service wires, and in no case will the Cooperative be responsible for the condition of the Applicant’s building to which the wires are attached. A ranch-type house or building with a low roof may require extension support above the roof to provide the necessary clearances. Where steel conduit is used for the extension support, it must have a minimum diameter of 2 ½ inches and shall not extend over 4 feet above the roof. Where meter poles are used, the minimum pole diameter shall be 6 inches. The pole shall be at least 20 feet in length with 15 feet above ground. Four-by-four posts shall not be allowed whether braced or not.
- Service at Primary Voltage –If an Applicant desires to take service at primary voltage, all substation structures, or vaults and all substation electrical equipment shall be installed, owned, and maintained by the Applicant unless special written arrangements are made with the Cooperative. All equipment shall comply in all respects with the National Electrical Code, National Electric Safety Code, and Cooperative specifications.
- Standby Service –The electric service of the Cooperative shall not be used as reserve or standby service or in any other way in conjunction with any other source of power without the Cooperative’s written consent. Where an emergency source of supply is provided by the Applicant, parallel operation of the Applicant’s generating equipment with the Cooperative’s system will not be allowed except where the Applicant entered a written contract with the Cooperative for load reduction purposes. A double throw switch must be used to prevent possible injury to the Cooperative’s workers by making it impossible for power to be fed back into the main line from the emergency generator.
- Right to Install Equipment –The Cooperative has the right to install poles, lines, transformers, or other equipment on the Applicant’s property, and to locate a delivery point and meter thereon, as the Cooperative deems appropriate, considering without limitation the cost of construction, adequacy of electric service, and aesthetic appearance.
- Plats and Surveys required –In Mobile Home Parks or Subdivisions, the Applicant shall provide to the Cooperative one printed copy of a properly surveyed and recorded plat/drawing of the subdivision plus an electronic copy in a digital format acceptable to the Cooperative.
- Damage Caused by Construction –The Applicant will sign an agreement absolving the Cooperative from responsibility for damage to shrubs, trees, grass, and underground pipes, lines, structures, or objects not specifically located and properly marked by the Applicant prior to the beginning of construction.
- Right of Way Easements –The Applicant will furnish, without cost to the Cooperative, necessary easements and rights of way across the Applicant’s property for the supply of electric service to the Applicant and other recipients of the Cooperative’s electric service.
- Additional Charges –Additional charges may, in the sole discretion of the Cooperative, be applied to the Applicant’s account as a Contribution in Aid of Construction to cover additional or extraordinary expenses including, by way of example, permits or condemnation expenses. Where applicable, the Cooperative’s legal expenses will be included in said charges. Generally, estimated costs must be paid in advance, with an adjustment to reflect actual cost when such cost becomes known. The Applicant may be required to sign an agreement to reimburse the Cooperative in advance for such expenses.
- Contributions, Fees, and Charges –No payment made by an Applicant as a Contribution in Aid of Construction, service fee, or facilities charge shall entitle the Applicant to ownership rights, rights of exclusive use, rights to restrict access by the Cooperative employees in the performance of their duties, the right to alter the Cooperative’s electric facilities, or the right to hinder the Cooperative from serving others via those electric facilities, except as may be otherwise provided by written agreement between the Cooperative and Applicant.
- Payments –In its sole discretion, the Cooperative reserves the right to collect any payments due under this Policy before planning or installation of the facilities begins.
The Applicant may be allowed to perform certain tasks to reduce the Applicant’s payment obligations to the Cooperative, provided (a) the Cooperative determines that the Applicant’s work will not reduce the installation quality and (b) maintenance of the facilities to be installed and such work is inspected by the Cooperative and deemed acceptable. Such tasks may include trenching, right-of-way clearing for overhead facilities, rock removal, and cutting and removal of pavement and other obstructions that may impede the Cooperative from using normal construction materials and equipment. When the Applicant elects to perform such work, the Applicant shall be solely responsible for obtaining all necessary permits, consulting with the Cooperative to ensure the work complies with Cooperative requirements, and complying with all state, federal, and local laws and regulations.
- Idle Facilities –If a line is removed and service is subsequently required at the location, service can be provided in accordance with the Line Extension Policy in effect at the time the request to have service reinstalled is made.
- Overhead Line Extensions
- Extensions of a Temporary Nature –Standard overhead extensions to serve temporary facilities will be made only if the Applicant pays the total estimated cost of installing and removing all electric facilities required for such service. Fees for single-phase temporary service for construction purposes which result in permanent service will not be charged when such extension requires no more than a transformer, 75 feet of service drop, and a meter.
- Extensions to Private Use Residential and Other Non-Commercial Loads
- Individual (i.e., single family) Residential Dwellings –Standard single-phase overhead extensions to serve an individual residence constructed to be a Dwelling will be made at no cost to the Applicant, provided the construction does not require a plant investment of more than two spans of primary conductor, transformer, service drop, and meter. A Dwelling must be on property owned or mortgaged by the Applicant, which shall have potable water under pressure into the dwelling with permanent type plumbing, an appropriate permanent sanitary waste system, and shall be accessible by an all-weather road.
In the event, the service extension requires more than two spans, an estimated cost of construction beyond two spans must be paid by the Applicant as a Contribution in Aid of Construction. In cases where the Applicant can show reasonable proof there will be additional customers served by the facilities required to serve the Applicant, the Cooperative may, in its sole discretion, consider these additional customers in calculating the Contribution in Aid of Construction.
The Applicant shall supply and own the service conductors for service entrances over 400 amps. Residences that require three-phase service shall be treated as commercial installations as specified in Paragraph 3.2.4 below.
- Miscellaneous Non-Commercial Loads (e.g., outbuildings, pumps, etc. used for non-business purposes) –Standard single-phase overhead extensions to serve loads associated with a residence, or a non-commercial structure that does not meet the definition of an enduring, permanent type dwelling in Paragraph 2a or any other load of a non-commercial nature, including without limitation shops, pumps, outbuildings, and other similar service purposes will be made at no cost to the Applicant provided the construction does not require a plant investment of more than a transformer, service drop, and meter. In the event that a plant investment of more than a transformer, service drop, and meter is required, the Applicant shall be required to pay a Contribution in Aid of Construction.
- Seasonal Non-Commercial Loads –Standard overhead single-phase temporary service for seasonal service to non-commercial Applicants will not be charged when such extension requires no more than a transformer, 75 feet of service drop, and a meter. In the event the service extension requires more than a transformer, 75 feet of service drop, and meter, the Applicant shall be required to pay a Contribution in Aid of Construction.
- Extensions to Loads of a Commercial Nature (including residential developments for resale or rent)
- Mobile Home Parks or Subdivisions –Standard overhead extensions to serve mobile home parks or subdivisions require a Contribution in Aid of Construction by the owner or developer. The Contribution in Aid of Construction will be sufficient to include the estimated initial investment of less than $2,000.00 for each mobile home to be located in the park or subdivision. An acceptable plat or survey as defined above must be submitted by the owner or developer, from which the Cooperative will develop electric service plans, determine estimated costs, and prepare contractual requirements as applicable. To assure recovery of its investment, the Cooperative may require, in its sole judgment, sufficient evidence of the developer’s intent and ability to complete the project, including but not limited to, evidence of the final receipt of all necessary governmental approvals prior to construction of electric facilities.
- Subdivision for Residential Dwellings –Standard overhead extension to residential subdivisions with restrictions for developing Dwellings will be made only where an acceptable plat or survey as defined above is provided by the owner or developer. A blanket subdivision easement suitable for recordation must be executed by the owner prior to sale of any individual lots. To assure recovery of its investment, the Cooperative may require, in its sole judgment, sufficient evidence of the developer’s intent and ability to complete the project, including but not limited to evidence of the final receipt of all necessary governmental approvals prior to the construction of any electric facilities. The estimated costs of new construction less than $2,000.00 for each dwelling to be located in the development shall be paid by the owner/developer as a Contribution in Aid of Construction. The development cost will include new electric distribution facilities inside and outside the development required to provide (primary and secondary) service to each lot of record in the subdivision. Additionally, improvements required to increase the capacity of the existing distribution system outside the development will be paid for by the Cooperative so long as those system improvements do not exceed $100,000. If the expenses for such improvements outside the development exceed $100,000 the Cooperative will determine the required Contribution in Aid of Construction, taking into consideration the following:
(a) Existing density in the area of the development;
(b) Projected growth outside the development;
(c) Existing needs for system improvements in the area;
(d) Likelihood of timely development within the proposed subdivision;
(e) Creditworthiness of the developer; and
(f) Willingness and ability of the developer to provide any requested surety.
- Land Developments –Standard overhead extensions to serve large-scale commercial or recreational developments require special approval and must be submitted on an acceptable plat or survey as defined above. The Cooperative will develop electric service plans, determine estimated extension costs and any Contribution in Aid of Construction, and prepare contractual arrangements as applicable. To assure recovery of its investment, the Cooperative may require, in its sole judgment, sufficient evidence of the developer’s intent and ability to complete the project, including but not limited to evidence of the final receipt of all necessary governmental approvals prior to the construction of electric facilities.
- Commercial and Industrial Applicants –Standard overhead extensions to commercial and industrial Applicants will be considered individually, and appropriate contractual arrangements made if required. The Applicant will be responsible for providing specific information, including without limitation, business identification/address (including corporate information), nature of business operation, connected electrical loads, operating service characteristics (i.e., desired operating voltage, phase configuration, hours of operation/production, etc.), main service panel data, and point of delivery location. The Cooperative will estimate all costs of construction and applicable operating and maintenance expenses to determine contractual arrangements necessary to recover such costs within a five (5) year contract period (or a shorter period for loads not expected to be in place for five (5) years). In making such calculations, the expense for transformers and any other equipment that, in the Cooperative’s judgment, could be utilized at other locations will be prorated according to its expected life. Any Contribution in Aid of Construction to be paid by the Applicant must be paid prior to placement of any order of materials and construction of any electric facilities by the Cooperative. The Applicant must grant an easement to the Cooperative providing for the location, protection, and maintenance of electric facilities. The Cooperative may, in its sole discretion, require an Applicant to execute an industrial power contract to safeguard its assets and investments.
- Apartments, Condominiums & Multiple Housing Units –Standard overhead extensions to serve apartments, condominiums, and other multiple housing units will be made at no cost to the owner or developer provided the estimated cost of construction does not exceed $1,000 times the number of individual housing units. When the extension cost exceeds $1,000 per unit, a Contribution in Aid of Construction will be charged which will include the estimated initial investment of the facility cost exceeding the $1,000 per unit allowance..
- Commercial Seasonal Service –Single or three-phase overhead extensions for seasonal service to commercial Applicants will not be charged when such extension requires no more than a transformer, service drop, and meter and the load will not exceed twenty-five (25) kilowatts in demand. In the event, the service extension requires more than a transformer, service drop, and meter, an estimated cost of construction shall be paid by the Applicant as a Contribution in Aid of Construction. Loads of more than twenty-five (25) kilowatts are considered Commercial and Industrial and service will be provided as in 3(d) above.
- Non-Standard Service –Extension requests for a non-standard service will require advance notice and consent from the Cooperative regarding the form and type of service needed. Before proceeding with the purchase of equipment or wiring in such cases, the Applicant should contact the Cooperative. The Cooperative will furnish information in writing on the character of the service available, the location of the Cooperative’s power lines, and the Cooperative’s ability to meet special requirements. Nothing herein contained shall obligate the Cooperative to provide such special service.
- Security Lighting –Security lights are available to both residential and non-residential Applicants for a flat monthly rental fee based on fixture and wattage. Applicants requesting security lighting service will be required to sign a twelve (12) month service contract. Security lighting will only be installed at locations where low voltage service exists. Special security lighting requests will be considered individually with Applicants responsible for such contracts and additional charges as may be required to provide recovery of investment and anticipated operating and maintenance costs.
- Underground Line Extensions
- Extensions of a Temporary Nature or to Temporary Facilities –Standard underground extensions to serve temporary facilities will be made only if the Applicant pays the total estimated cost of installing and removing all electric facilities required for such service. Single-phase temporary service for construction purposes, which will result in a permanent service location, will be provided only when it can be serviced from an existing pad-mounted transformer. Customers shall not be charged when such extension requires no more than 15 feet of service drop and meter.
- Extensions to Private Use Residential and Other Non-Commercial Loads
- Individual (i.e. single family) Residential Dwellings –Standard single-phase underground extensions to serve an individual residence constructed so as to be a Dwelling will be made at no cost to the Applicant, provided the construction does not require a plant investment of more than two hundred and fifty (250) feet of primary conductor, transformer, service drop, and meter. A Dwelling shall be on property owned or mortgaged by the Applicant and shall have potable water under pressure into the dwelling with permanent type plumbing, an appropriate permanent sanitary waste system, and be accessible by an all-weather road.
In the event that the service extension requires more than two hundred and fifty (250) feet of primary conductor, transformer, service drop, and meter, an estimated cost of construction shall be paid by the Applicant as a Contribution in Aid of Construction. The Applicant shall supply and own the service conductors for service entrances over 400 amps. Residences that require three-phase service shall be treated as commercial installations as specified in Paragraph 4.3.4 below. - Miscellaneous Non-Commercial Loads (e.g. outbuildings, pumps, etc. used for non-business purposes) –Standard single-phase underground extensions to serve loads associated with a residence, or a non-commercial structure that does not meet the definition of an enduring, permanent type dwelling or any other load of a non-commercial nature, including without limitation shops, pumps, outbuildings, and other similar service purposes, will be made at no cost to the Applicant, provided the construction does not require a plant investment of more than a transformer, service drop, and meter. If a plant investment of more than a transformer, service drop, and meter is required, a Contribution in Aid of Construction shall be paid by the Applicant.
- Seasonal Non-Commercial Loads –Single-phase standard underground temporary service for seasonal service to non-commercial Applicants will not be charged when such extension requires no more than a transformer, 75 feet of service drop, and a meter. If the service extension requires more than a transformer, 75 feet of service drop and meter, an estimated cost of construction shall be paid by the Applicant as a Contribution in Aid of Construction.
- Individual (i.e. single family) Residential Dwellings –Standard single-phase underground extensions to serve an individual residence constructed so as to be a Dwelling will be made at no cost to the Applicant, provided the construction does not require a plant investment of more than two hundred and fifty (250) feet of primary conductor, transformer, service drop, and meter. A Dwelling shall be on property owned or mortgaged by the Applicant and shall have potable water under pressure into the dwelling with permanent type plumbing, an appropriate permanent sanitary waste system, and be accessible by an all-weather road.
- Extensions to Loads of a Commercial Nature (including residential developments for resale or rent)
- Mobile Home Parks or Subdivisions –Standard underground extensions to serve mobile home parks or subdivisions require a Contribution in Aid of Construction by the owner or developer. The Contribution in Aid of Construction will be sufficient to include the estimated initial investment, less $2,000.00 for each mobile home to be located in the park or subdivision. An acceptable plat or survey must be submitted by the owner or developer, from which the Cooperative will develop electric service plans, determine estimated costs, and prepare any required documents. To assure recovery of its investment, the Cooperative may require, in its sole judgment, sufficient evidence of the developer’s intent and ability to complete the project, including but not limited to, evidence of the final receipt of all necessary governmental approvals prior to construction of electric facilities.
- Subdivision for Residential Dwellings –Standard underground extensions serving residential subdivisions with restrictions for developing Dwellings will be made only where an acceptable plat or survey as defined above is provided by the owner or developer. A blanket subdivision easement suitable for recordation must be executed by the owner prior to sale of any individual lots. To assure recovery of its investment, the Cooperative may require, in its sole judgment, sufficient evidence of the developer’s intent and ability to complete the project, including but not limited to evidence of the final receipt of all necessary governmental approvals prior to the construction of any electric facilities. The estimated costs of new construction less than $2,000.00 for each dwelling to be located in the development shall be paid by the owner/developer as a Contribution in Aid of Construction. The development cost will include new electric distribution facilities inside and outside the development required to provide service to each lot of record in the subdivision. Land Developments –Standard underground extensions to serve large-scale commercial or recreational developments require special approval and must be submitted on an acceptable plat or survey. The Cooperative will develop electric service plans, determine estimated extension costs and any Contribution in Aid of Construction, and prepare contractual arrangements as applicable. To assure recovery of its investment, the Cooperative may require, in its sole judgment, sufficient evidence of the developer’s intent and ability to complete the project, including but not limited to evidence of the final receipt of all necessary governmental approvals, prior to construction of electric facilities.
- Commercial and Industrial Applicants –Standard underground extensions to commercial and industrial Applicants will be considered individually, and appropriate contractual arrangements will be required. The Applicant will be responsible for providing specific information, including without limitation, business identification and address (including corporate information), nature of business operation, connected electrical loads, operating service characteristics (i.e., desired operating voltage, phase configuration, hours of operation/production, etc.), main service panel data, and point of delivery location. The Cooperative will estimate all costs of construction and applicable operating and maintenance expenses to determine contractual arrangements necessary to recover such costs. In making such calculations, the expense for transformers and any other equipment that, in the Cooperative’s judgment, could be utilized at other locations will be prorated according to its expected life. The Applicant must grant to the Cooperative an easement providing for the location, protection, and maintenance of electric facilities. Execution of Industrial Power Contracts, as that term is defined in the Cooperative’s rates schedules and Service Rules and Regulations, will be required on all Applicants whose demand requirements exceed five hundred (500) kilowatts; provided, however, the Cooperative may require contracts for Applicants whose demand requirements are less than five hundred (500) kilowatts.
- Apartments, Condominiums & Multiple Housing Units –Standard underground extensions to serve apartments, condominiums, and other multiple housing units will be made at no cost to the owner or developer, provided the estimated cost of construction does not exceed $1,000.00 times the number of individual housing units. When the extension cost exceeds $1,000 per unit, a Contribution in Aid of Construction will be charged, which will include the estimated initial investment of the facility cost exceeding the $1,000 per unit allowance.
- Commercial Seasonal Service –Fees for standard single or three-phase underground extensions for seasonal service to commercial Applicants will not be charged when (a) such extension requires no more than a transformer, service drop, and meter and (b) when the load will not exceed twenty-five (25) kilowatts in demand. If the service extension requires more than a transformer, service drop, and meter, a Contribution in Aid of Construction must be paid by the Applicant. Loads of more than twenty-five (25) kilowatts are considered Commercial and Industrial, and service will be provided as in 4.3.4 above.
- Conversion from Overhead to Underground Service –When an Applicant requests the Cooperative replace an existing overhead line with underground lines, such work will be completed in accordance with the following:
(a) The Applicant must pay a Contribution in Aid of Construction for the installation of underground facilities in an amount equal to the estimated cost of the facilities to be installed;
(b) The Applicant must pay a Contribution in Aid of Construction amounting to the depreciated original cost of any existing overhead facilities, plus the estimated cost of removing such facilities. If the Applicant is adding load such that the Cooperative’s existing facilities are no longer adequate then these removal costs will be waived.
- Non-Standard Service –Extension requests of a non-standard underground service nature will require conferring in advance with the Cooperative regarding the form and type of service needed. Before the Applicant proceeds with the purchase of equipment or wiring in such cases, said Applicant should contact the Cooperative. The Cooperative will furnish information in writing on the character of service available, the location of the Cooperative’s power lines, and the Cooperative’s ability to meet special requirements. Nothing herein contained shall obligate the Cooperative to provide such special service.
- Security Lighting –In addition to other fees and requirements, Applicants requesting underground service to security lighting will be required to pay a Contribution in Aid of Construction necessary to serve said security light if more than 150 feet of cable is necessary to service said security light. For each foot in excess of 150, the Applicant will pay the required Contribution in Aid of Construction. In the event security lighting is daisy-chained, distance will be measured from the power source to the furthest security light fixture. Security lighting will only be installed at locations where appropriate electrical service exists. Security lighting requests will be considered individually with Applicants responsible for such contracts and additional charges as may be required to provide recovery of investment and anticipated operating and maintenance costs.
- Abnormal Line Extensions
- Right-of-Way Clearing –Right-of-way clearing for new line extensions will be cleared by the Cooperative. The cost for clearing rights of way will be considered in the calculations for any Contribution in Aid of Construction. If the Applicant so chooses, the Applicant can clear the right of way or have it cleared on their behalf to the Cooperative’s specifications. When the Applicant chooses this option, those costs will not be a part of the calculations to determine any required Contribution in Aid of Construction.
- Abnormal Construction –Abnormal construction costs will be charged to the Applicant as a Contribution in Aid of Construction.
- Abnormal construction costs are incurred when physical obstacles or adverse conditions preclude the use of the Cooperative’s standard construction methods, or extraordinary labor, as determined in the sole discretion of the Cooperative, is necessary to install the Cooperative’s facilities to serve the Applicant. Abnormal construction includes without limitation the following conditions:
- the topography or composition of land where facilities are to be installed is such that the Cooperative’s standard construction equipment cannot be used to complete the installation;
- extraordinary labor is required to perform the installation;
- special equipment and materials are needed for stream-crossing structures or concrete structures;
- explosives are required;
- additional costs will be incurred by the Cooperative to comply with Applicant’s requirements;
- additional costs will be incurred by the Cooperative to comply with applicable law regarding the replacement of pavement, ditching, compaction, backfilling or other related conditions; or
- when it is necessary to install underground facilities under existing streets, sidewalks, patios, or other paved areas.
- Abnormal Design –Abnormal design costs will be charged to the Applicant as a Contribution in Aid of Construction. Abnormal design costs are incurred when the Applicant requests facilities or construction methods that exceed the Cooperative’s standard engineering design practices or the standard design.
Obstructions – The Applicant must remove or cause to be removed all obstructions from the route along which the Cooperative’s underground facilities are to be installed and provide continuing access to the Cooperative for operation, maintenance, or replacement of these facilities. The Cooperative will not be responsible for any damage to any shrubs, trees, grass, or any other foliage or property caused by the Cooperative’s equipment during the installation, maintenance, or replacement of the Cooperative’s facilities. The Applicant shall be responsible for all such items, and for filling, reseeding, resodding, or otherwise completing the trench cover. The Cooperative shall not be responsible for the repair or replacement of any underground facilities on the Applicant’s premises damaged during the installation of the Cooperative’s facilities, unless, prior to the Cooperative’s construction, the Applicant clearly identifies the location of such facilities. When required, Applicant shall install conduit specified by the Cooperative in locations where underground conductors will cross under paved areas when paving is completed prior to the installation of the Cooperative’s underground conductors.